Rewiring (Full & Part)
Full and partial rewiring for new builds, refurbishments and older properties — planned around your project.
What it is
Rewiring replaces a property's electrical installation — cabling, consumer unit, sockets, switches and lighting circuits. Whether it's a full rewire of an older property or a part-rewire as part of a renovation, we plan it to cause minimum disruption.
Who legally needs it
Properties over 25–30 years old that haven't been rewired often need it for safety and to meet modern demand. It's also standard during major refurbishments, extensions, and when an EICR flags the installation as unsatisfactory.

Rewiring is one of the most significant investments you can make in a property. Whether you are renovating a period home, updating a rental or fitting out a new build, a modern electrical installation keeps the property safe, meets current regulations and handles the demands of modern life. We plan every rewire around your project so you get a certified installation with as little disruption as possible.
Signs a property needs rewiring
- Frequent tripping of circuit breakers or blown fuses
- Discoloured sockets or switches — scorching or brown marks
- Burning smells from the consumer unit or from outlets
- No earth at sockets or on lighting circuits
- Old rubber or lead-sheathed cabling still in place
- An EICR that grades the installation unsatisfactory
Most installations last 25 to 30 years. If a property has not been rewired in that time it is worth a professional assessment. If you are planning a major refurbishment, extension or loft conversion, rewiring is almost always part of the job — running new cables while walls are open is far easier and cheaper than going back later.
Full or partial rewire
A full rewire replaces the entire installation — all cabling, the consumer unit, sockets, switches and lighting circuits. It is the right choice for older properties, major renovations, or where an EICR has found widespread problems.
A partial rewire covers specific circuits or areas — a new kitchen circuit, a dated consumer unit, or a single floor. We assess what is actually needed and give you an honest recommendation rather than defaulting to the bigger job.
What the job involves
- Survey and circuit design — mapping the new installation to your needs and to BS 7671
- First fix — running new cables, installing back boxes and the consumer unit
- Second fix — fitting sockets, switches and light fittings
- Testing and certification — full inspection and testing, then an Electrical Installation Certificate
The Electrical Installation Certificate is your proof the work complies with building regulations — needed when selling, letting or insuring the property.
Honest about the disruption
Rewiring is disruptive and we will not pretend otherwise. We plan it to cause as little upheaval as we can: an agreed schedule, floors and furniture protected, and every room left clean at the end of the day.
What's included
- Survey and circuit design
- Full or partial rewire as required
- New consumer unit with modern protection
- Sockets, switches and lighting points
- Electrical Installation Certificate on completion
- Certificate filed in your secure customer portal
from £2,000
full rewire; part rewires and new-builds quoted per project
Every job is quoted exactly before work starts — no hidden extras. Tell us about your property and we'll confirm your exact price within one working day.
Get My Exact QuoteFrom booking to certificate, in four steps
Book
Request a quote online or by phone and we'll arrange a survey.
Survey
We assess the property and provide a fixed, itemised quote before any work is booked in.
Rewire
Our engineers carry out the first and second fix to the agreed schedule.
Certificate
Your Electrical Installation Certificate is issued on completion and stored in your portal.
Rewiring — your questions answered
How long does a full rewire take?
A typical two or three bedroom house usually takes several working days. Larger properties, or those with awkward access or complex requirements, take longer — we confirm a realistic schedule at the survey rather than guessing over the phone.
Do I need to move out during the rewire?
Not necessarily. Many customers stay in the property, though you will need to work around the power being off in each room as it is rewired. We agree a plan that works for you before we start.
Is rewiring covered by building regulations?
Yes. As a Part P registered installer we self-certify the work and issue an Electrical Installation Certificate, so you do not need a separate building control inspection.
Can you rewire around a tenanted property?
A part rewire can often be staged around occupancy. A full rewire is usually best done between tenancies — we can work to a void period and have the certificate ready before the next tenant moves in.
Need Rewiring?
Get an exact quote within one working day — and once the work is done, your certificate is stored in your customer portal.
